RDQ: Required Delivery Dates
The RDQ segment appears in
1 message:
CORDER.
| Element | Name | M/C | F/V | Format | Notes |
|---|---|---|---|---|---|
SEQA | First Level Sequence Number | M | V | 9(10) | Value as per corresponding COD sequence number |
SEQB | Second Level Sequence Number | M | V | 9(10) | Starts at 1 and is successively incremented by 1 within each second-level nested sequence of this segment |
RDAT | Required Delivery Date | C | F | 9(6) | Date on which delivery is expected or required. Format: YYMMDD If date is to be announced, transmit as 999999 |
RQTY | Quantity Required composite | C | At least one of the following sub-elements must be quoted. If the Total Measure Required is quoted the Measure Indicator must be quoted too Total number of traded units required eg. 100 (x 24 Cans) Total weight, volume, length required. Used when ordering variable measure items Abbreviation for the ordering measure eg. pounds, metres, litres. Code Values List 4. Mandatory if Total Measure Ordered used | ||
| Number of Traded Units Required | C | V | 9(15) | ||
| Total Measure Required | C | V | 9(10)V9(3) | ||
| Measure Indicator | C | V | X(6) |
Need to exchange TRADACOMS messages with a UK retailer?
SupplyLens connects your ERP, e-commerce or accounting system to any TRADACOMS or EDIFACT trading partner: orders in, invoices out, fully managed.
Book a demo Learn about retail EDI →